Villa
Baħar iċ-Ċagħaq

One villa, two contracts, one team — from the first slab to the last cactus in the gravel bed.

Sector
Residential
Location
Baħar iċ-Ċagħaq, Malta
Our role
Construction & finishing
Architecture
CVC Architecture
The project

Structure and finish,
under one contractor.

Most villas of this size change hands halfway through — one contractor builds the shell, another arrives to finish it, and the drawings get reinterpreted somewhere in between. This one did not.

Alongside the construction of the villa, Schranz was entrusted with the finishing works: mechanical and electrical installations, tile laying, plastering and painting, exterior flooring and landscaping among them. Working with CVC Architecture, the same team that set out the frame set out the floors.

That continuity is the reason a 4mm tolerance agreed at structure stage still means something when the stone arrives. Below, the project is split into the two phases exactly as it was built — switch between them to see the same building at each end of the job.

Completed villa terrace at Baħar iċ-Ċagħaq Completed  ·  Terrace
Two phases

Follow the build.

The same villa, documented at structure and at handover.

Phase 01  ·  Construction

Cut into the slope,
then built back up.

The site steps down toward the coast, so the structure had to be set out against a fall rather than a flat plot. Excavation, retaining and the reinforced concrete frame were sequenced to keep the terraces and the pool deck at the levels the design depended on.

Shutterers, steel fixers and concreters from our own team carried the frame. The drone record below was taken through the works.

Phase scope
01Excavation and site formation on a sloping plot
02Retaining structures and foundations
03Reinforced concrete frame and slabs
04Blockwork and licensed masonry
05Pool shell and terrace structure
06Site management and health & safety
Aerial view of the villa under construction
Reinforced concrete frame
Slab construction
Terrace structure taking shape
Villa site against the coastline
Site overview
Levels and falls across the plot
Pool deck under construction
Retaining structures
Building envelope
Roof level works
Construction progress
Construction progress
Building massing
Shell nearing completion
End of phase 01  ·  Construction

That is the structure. Now see it finished.

Phase 02 covers the mechanical and electrical installations, tiling, plastering, exterior flooring and landscaping.

Phase 02  ·  Finishes

Where the tolerances
finally show.

The finishing contract covered the mechanical and electrical installations, tile laying, plastering and painting, exterior flooring and landscaping — the packages that turn a structure into a house someone lives in.

Large-format stone, frameless glazing and flush junctions leave nowhere to hide a few millimetres. Setting out was agreed with the architect before the first cut.

Nothing here can be corrected with a wider grout line.
Phase scope
01Mechanical and electrical installations
02Tile laying and stone flooring
03Plastering and painting
04Apertures, glazing and joinery
05Exterior flooring and terraces
06Landscaping and planting
Finished terrace and planted courtyard
Completed villa exterior
Living space with sea view
Finished interior
Stone flooring detail
Joinery detail
Frameless glazing
Exterior flooring and terrace
Landscaping and planting
Finish detail
Finish detail
Approach to the villa
End of phase 02  ·  Finishes

Want to see how it got here?

Phase 01 documents the excavation, retaining works and reinforced concrete frame that this finish sits on.

More projects
Building a home?

Structure and finish,
one contract.

Keeping both phases under one contractor is the cheapest quality control there is. Tell us about your site.